Photo Documentation: 1st CCP

SOCIAL PREPARATION ACTIVITIES:

Pampanga

 

NMGL-leaders-discuss-irrigation-plansNMGL leaders discuss irrigation plans and on-going activities with LGU officials in Angeles City, Pampanga.

PDI-explaining-the-project-details-to-PO-leaders-from-Bgy-MargotPDI explaining the project details to PO leaders from Bgy. Margot, Angeles City, Pampanga

Engineer-Rolando-Orjalo-explains-the-technical-merits-of-the-overhead-tank-and-submersible-pumpEngineer Rolando Orjalo explains the technical merits of the overhead tank and submersible pump.


HUMAN RESOURCE DEVELOPMENT ACTIVITIES 

Zambales

Preparations-for-the-conduct-of-survey-in-Botolan-ZambalesPreparations for the conduct of survey in Botolan, Zambales

Conduct-of-site-visit-with-various-stakeholders-in-Botolan
Conduct of site visit with various stakeholders in Botolan.

Conduct-of-consultation-with-PO-partnersConduct of consultation with PO partners

The-water-fall-in-Belbel
The water fall in Belbel, Botolan, Zambales

Photo-shows-lahar-that-is-now-threatening-the-proposed-project-sitePhoto shows lahar that is now threatening the proposed project site of Maguisguis, Botolan, Zambales

ENGINEERING AND CONSTRUCTION
PAMPANGA

WATER TANK


Lay-out-and-digging-of-land-for-foundation-of-pedestal-column-for-water-tank.

Lay-out and digging of land for foundation of pedestal column for water tank.

Footing-and-tie-beam-need-4-7-days-to-dry-before-pouring-of-pedestal-column
Footing and tie beam need 4-7 days to dry before pouring of pedestal column

On-site-rebar-works
On-site rebar works, form works, welding of column and bracing for tank.

Erection-of-beam-column-of-elevated-postErection of beam column of elevated post

Assembly-of-water-tankAssembly of water tank

finished-water-tank2The finished water tank

Finished Overhead Water Tank at Bgy Margot, Angeles City, Pampanga

finished-water-tank

WATER PUMPS

Set-up-of-the-machineSet up of the machine, preparation for drilling

Sounding-&-drilling-of-temporary-casingSounding & drilling of temporary casing.

Removal-of-silt-and-mud-from-drilling-areaRemoval of silt and mud from drilling area

Assembly-of-submersible-pumpAssembly of submersible pump

Assembly-of-control-panelAssembly of control panel

Water-pump-assembly-with-overhead-tankWater pump assembly with overhead tank

Newly-finished-water-pump-in-operationNewly finished water pump in operation, Bgy Margot, Angeles City, Pampanga

WATER RESERVOIR

Digging-and-excavation-of-land-for-the-reservoirDigging and excavation of land for the reservoir.

Cement-works-to-meet-water-storage-capacity-Note-the-rectangular-shape-of-the-ground-water-reservoirCement works to meet water storage capacity. Note the rectangular shape of the ground water reservoir.

Semi-finished-water-reservoir-as-viewed-from-the-feeder-roadSemi-finished water reservoir as viewed from the feeder road.